14 results.
-
Guide · Electrical engineering
Reading an arc flash label
An arc flash label tells a qualified worker how dangerous a piece of electrical equipment could be if an arc flash happened while they were working on it energized, and what distances and protective equipment apply. The values come from an engineering study …
-
Service · Electrical engineering
Arc flash studies and labelling
An arc flash study calculates how much energy would be released if an arc fault occurred at each piece of electrical equipment, and how far from it a person could be burned. The results go on labels fixed to the equipment and into your electrical safety …
-
Guide · Electrical engineering
What happens in an arc flash study
An arc flash study collects data on your electrical equipment, builds a computer model of the system, calculates fault currents and protective device clearing times, and from those works out the incident energy and arc flash boundary at each piece of …
-
Guide · Electrical engineering
Available fault current explained
… and date A single-line diagram of the modelled system, with bus names that match the equipment labels The assumptions made where data could not be collected, such as estimated cable lengths Calculated fault current at each bus, for the operating scenarios …
-
Service · Electrical engineering
Short-circuit and coordination studies
… they are the foundation of a safe, reliable distribution system and the starting point for an arc flash study. These studies are often skipped until something goes wrong: a fault in one office trips the main breaker and blacks out the whole building, or an …
-
Guide · Electrical engineering
Single-line diagrams explained
… Bus in a switchboard or panel Bus rating, voltage, short-circuit rating Circle with M or a meter label Revenue or sub-meter Who owns it, what it measures Circle with G Generator kW rating, voltage, fuel Box labelled ATS Automatic transfer switch Ampere …
-
Service · Electrical engineering
Electrical design for buildings
… Studies that support the design: load calculations, voltage drop, short-circuit, coordination and arc flash. One design, many systems. Power enters through the service and main switchboard and is divided among lighting, panels, mechanical equipment, backup …
-
Guide · Electrical engineering
UPS bypass and maintenance
… it, what to check before the next step and how to back out if something unexpected happens. Clear labels on every breaker and switch, matching the procedure and the single-line diagram posted at the equipment. A low-risk window. While on bypass, a utility …
-
Guide · Electrical engineering
Panelboards, switchboards and MCCs
… the service, they see the highest available fault current in the building and often the highest arc flash hazard. Their ratings, protective device settings and maintenance records matter more than anywhere else in the system. Motor control centres A motor …
-
Guide · Electrical engineering
Transformers in commercial buildings
… Correcting voltage for one machine, control circuits Small, but still need correct protection and labelling Sizing and placement Transformers are rated in kVA, the apparent power they can deliver continuously without overheating. A designer sizes one from the …
-
Guide · Electrical engineering
When to upgrade your electrical service
… diagram, panel schedules and, where a study is needed, updated short-circuit, coordination and arc flash information. A typical case A small strip mall with an older service gets a lease enquiry from a restaurant. The restaurant wants a commercial kitchen …
-
Guide · Electrical engineering
UPS batteries and runtime
… margins, keeping batteries cool and testing them on a schedule are what make the runtime on the label the runtime you actually get. What runtime depends on Runtime is how long the UPS can carry the load on battery alone. It is set by how much energy the …
-
Guide · Electrical engineering
120/208 V vs 347/600 V systems
… it will go? Safety procedures Both systems are dangerous. At 600 V, available fault currents and arc flash hazards can be significant, and approach boundaries are larger. Work on either system is done by qualified workers following an electrical safety …
-
Guide · Electrical engineering
The data centre power chain, from utility to rack
… without dropping load, and does staff know the procedure? Is each PDU, RPP and rack circuit labelled so the source of every rack can be traced? How close is each circuit and each UPS to its limit, and who watches that number? Switching is skilled work. …
Not finding it? Ask us or call 1-833-888-0091.